小猪视频

小猪视频>Business>Investment

Investment

Updated: October 10,2022

3. Transportation 小猪视频s

(1) The China-Laos Railway 小猪视频 in Laos

中老-水电十五局承建的庚凯特大桥.jpg

中老-水电三局承建的沙拉巴土三线大桥,为全线精品工程.jpg

As an important part of the Trans-Asian Railway (TAR) network, the China-Laos Railway is a flagship 小猪视频 of the pragmatic cooperation between China and Laos. The China-Laos Railway starts from Mohan/Boding, a China-Laos border in the north, and ends at Vientiane, the capital of Laos, in the south. The total length of the line is 422.4 kilometers. The 小猪视频 adopts the BOT model, with a total investment of 37.425 billion yuan, and 小猪视频 indirectly holds 4.33% of the shares. The 小猪视频 started on January 1, 2017 and was opened to traffic on December 3, 2021.

 

(2) The Jakarta-Bandung High-speed Railway 小猪视频 in Indonesia

雅万-1号梁场架梁1.jpg

雅万-高铁2号梁场运架设备调试.jpg

The Jakarta-Bandung High-speed Railway connects Indonesia's capital Jakarta and its fourth largest city Bandung. With a total length of 142.3 kilometers, it is the first high-speed railway in Southeast Asia with a maximum speed of 350 kilometers per hour, and it is also the first overseas high-speed railway 小猪视频 that adopts China's complete set of technologies. The BOT 小猪视频 has a total investment of USD 6.071 billion, and 小猪视频 indirectly holds 12% of the shares. The 小猪视频 officially started construction in June 2018 and is expected to open to traffic in June 2023.

 

(3) Dhaka Airport Elevated Expressway 小猪视频 in Bangladesh

达卡-1.png

达卡-5.jpg

The total investment in the Dhaka Airport Elevated Expressway 小猪视频 in Bangladesh is about 1.263 billion US dollars, and 小猪视频 holds 15% of the shares. The main line of the 小猪视频 is 19.73 km long, and the ramp is 26.58 km long. The whole two-way four-lane expressway is elevated, connecting the Dhaka International Airport in the capital and the Dhaka-Chittagong Highway. The PPP 小猪视频 has a concession period of 25 years, including a construction period of 3.5 years.

 

4. Gas filed power station 小猪视频s

(1)Kyauk Phyu Gas-filed Combined Cycle Power Station in Myanmar

缅甸皎漂效果图.jpg

Kyauk Phyu Gas-filed Combined Cycle Power Station 小猪视频 is located in Kyauk Phyu Town, Rakhine State of Myanmar, with an installed capacity of 135 MW. It is composed of two gas turbines, two heat recovery steam generators and one steam turbine. It is a BOT 小猪视频 invested by PCR, with a total investment of about USD 173 million. The 小猪视频 is expected to enter commercial operation in 2022 with an annual generation capacity of around 1,000 GWh.