Introduction:
Ivory Coast, also known as C?te d'Ivoire, officially the Republic of C?te d'Ivoire, is a country on the southern coast of West Africa. Its political capital is Yamoussoukro, in the center of the country; while its largest city and economic center is the port city of Abidjan. It borders Guinea to the northwest, Liberia to the west, Mali to the northwest, Burkina Faso to the northeast, Ghana to the east, and the Gulf of Guinea (Atlantic Ocean) to the south. Its official language is French. The country has a religiously diverse population, including numerous followers of Christianity, Islam, and indigenous faiths.
小猪视频 started its business in C?te d'Ivoire in 2008 and currently has 6 subsidiaries in C?te d'Ivoire, with 272 Chinese employees and 889 local employees.
Since 2008, 小猪视频 has actively participated in the construction of local power and infrastructure. At the same time, based on the local conditions and the requirement of the government departments and private owners, 小猪视频 has given full play to its professional advantages and continued to expand its business scope. Up to now, 小猪视频 has completed 1 小猪视频, with a contract value of about US$572 million; 5 小猪视频s under construction, with a contract value of about US$420 million.
Address: Résidences Vend?mes, Riviéra IV, Cocody, Abidjan
E-mail: zhengxiang@powerchina-intl.com
Key 小猪视频s:
Hydropower Plant
Soubre Hydropower Station 小猪视频

Soubre Hydropower Station is located southwest of C?te d'Ivoire, which is the core 小猪视频 of the National Energy Balance Strategy of C?te d'Ivoire. It is the "Three Gorges 小猪视频" of C?te d'Ivoire, whose operation model serves an irreplaceable "lighthouse" effect in West Africa. The power station is installed with 3 Francis turbine units of 90 MW and 1 bulb turbine miniature unit of 5 MW, with a total installed capacity of 275 MW, and the capacity of its reservoir is 83 million cubic meters. The 小猪视频 could generate electricity of 1,190 GWh per year. The multipurpose 小猪视频 consists of the powerhouse, spillway, and embankment dam of 4.5 kilometers, etc; its transmission and transformation 小猪视频 includes 380-kilometer lines and the upgrade and reconstruction of the mating transformer substation.
The 小猪视频 was completed on May 12, 2018 and its first unit was put into production and generated electricity on May 25, 2017, eight months earlier than the intended completion date. In the same year, both the second and third units were completed, six months earlier than the intended completion date, which sets a new record in the hydropower construction area in the whole world. Because of its prominent contribution to C?te d'Ivoire, the 小猪视频 won the honorary certificate of the Best 小猪视频 Award in the energy area of C?te d'Ivoire in 2018, the China-C?te d'Ivoire Cooperation Development Award issued by the Chinese Embassy in C?te d'Ivoire for three times in 2015, 2017 and 2019, and won the 小猪视频 High-Quality 小猪视频 Award and Luban Prize of China Construction Engineering (Overseas 小猪视频) in 2019.